• Folks, if you've recently upgraded or renewed your annual club membership but it's still not active, please reach out to the BOD or a moderator. The PayPal system has a slight bug which it doesn't allow it to activate the account on it's own.

Bath Room Remodel Thumbs way up for Mikem and John

Edwardw771

NJRC Member
Mike and John are doing my bathrooms. Mike is a like the zen master when it comes to this kind of stuff. Here are a few pics of the half bath that is just about done. And the full bath they are putting sheet rock up on. It was a fun job removing 2 inches of Concrete with wire lath and 1950s tiles.
We thank you both for your hard work. If anyone needs work done Mike is the man.

Half Bath
100_1218.jpg

100_1219.jpg

100_1220.jpg

100_1221.jpg


Full Bath
100_1224.jpg

100_1225.jpg

100_1226.jpg

100_1227.jpg
 

Phyl

Officer Emeritus
Officer Emeritus
Great progress pictures, Ed! I can't wait to see the finished art. I've been hearing the blow by blow so to see the pictures is great!
 

mikem

Officer Emeritus
Officer Emeritus
diverrk said:
Who's your electrician . I see an empty box in there ;D

Look harder, you don't see a GFCI in there? ;D


Ed. Show the pics of the piles and contractor bags full of concrete walls and floors that you and John had to remove.
These guys busted their back removing an inch and half concrete walls and two inches on the floors, with Wire Mesh.
When I talk to John or Ed on the job now, I say "Sir, can you Please help me lift this or that. ;D " They have new muscles in places that they never knew existed.

Ed and Jen. It's always a pleasure working for yous.
 

Brian

Officer Emeritus
Officer Emeritus
Looks good guys! When you were telling me about the concrete I didn't even think about wire! My back aches for you.
 
I know all about the concreteand wire mesh. When I did my bathroom I was tossing all the crap out the window, when I was done I was left with a pile 6ft high x 9 ft long. I said to my self, self just call someone to clean it up, and I listened to myself. Took the guy 5 hours to haul it away.
 

JohnS_323

Officer Emeritus
Officer Emeritus
diverrk said:
I know all about the concreteand wire mesh. When I did my bathroom I was tossing all the crap out the window, when I was done I was left with a pile 6ft high x 9 ft long. I said to my self, self just call someone to clean it up, and I listened to myself. Took the guy 5 hours to haul it away.

That sounds like the size of this pile. Plus we carried out about 80 to 100 salt buckets filled with rubble in addition to the big chunks that we were able to throw out the window.

And I don't care what Mike says, he's still the "Sir" in this operation. The guy is a complete artist when it comes to this stuff. The best I've seen for sure.
 

Edwardw771

NJRC Member
I never reliazed how doing bathrooms would be so stressfull. I so need to go back for Aruba. So for this week I've kicking my front door in (cause the lock broke) I tried to climb in a window and couldn't cause I'm too fat.

Today I got into a screaming match with a Director on the Job.

AHHHHHHHHHHHHHHHHH is all I have to say.
 

Edwardw771

NJRC Member
Things are going much better over here. The guys are really getting things done. All Elec, sheet rock and plumbing is done Tiles are now in progress.

100_1235.jpg

100_1239.jpg

100_1236.jpg

100_1228.jpg
 
Now the grout, oh fun, hope you knee's are strong. Looks good is that a shampoo recess in the wall? I did the same in mine great idea. Bobb
 

Phyl

Officer Emeritus
Officer Emeritus
And I paid someone to tile my bathroom... why?! LOL! Great work, guys!
 