Hey guys. I had some extra time today (which never happens) so I decided to re-plumb my frag tank. I have been meaning to do this for a while now but like I said I dont get too much free time. I removed the poly piping that I had and redid everything with 1" PVC. I also included a manifold to run my reactors and get rid of the small pumps I was using to run them. Now my main pump (mag 5) runs my carbon/gfo reactor and my bio-pellet reactor. The new plumbing really "opened" things up under the tank where room is very limited.
Here's a few pictures
Here's a few pictures