Hey guys. Im looking for some help. After 6 months of disappointments, I finally got my new tank. Most people I've spoken too, are booked up a couple week in advance. I would really like to get my tank plumbed this week if at all possible. It's 72x28x22 with a glass holes overflow. 2" drains/ 1" returns. Sump is underneath the cabinet. The drains into the sump, I assume will need to be drilled out a bit, as they are only 1" I believe. I have no experience with plumbing, so I do not wish to tackle this by myself.