Yesterday November 15, 2012, NJRC members stopped by and helped moving the tank and the stand out of the house for cleaning and preparation of resetup.
Today November 16, 2012, before leaving work, I checked the tank condition and found that top and bottom plastic rims were cracked due to temperature stress.
I need to replace the trim and I need to call Aquatic Obsession up.
I will clean the tank today after get back from work around 3pm.
Today November 16, 2012, before leaving work, I checked the tank condition and found that top and bottom plastic rims were cracked due to temperature stress.
I need to replace the trim and I need to call Aquatic Obsession up.
I will clean the tank today after get back from work around 3pm.