so i picked up a 75 corner drilled, and the overflow is on what would be the rear left,
and i need it on the rear right, so i was thinking of re drilling it in the other corner,
plugging the existing 2 holes, and moving the overflow box.
has anyone drilled a drilled tank?
how did you seal the existing holes?
any worries of the water pressure on the that drilled area?
thanks
and i need it on the rear right, so i was thinking of re drilling it in the other corner,
plugging the existing 2 holes, and moving the overflow box.
has anyone drilled a drilled tank?
how did you seal the existing holes?
any worries of the water pressure on the that drilled area?
thanks