I've been thinking about redoing my piping arrangement. I was shooting for one pump to handle everything. I have not shown any valves in the drawing, but obviously there would be valves on all the branches to the PO4 reactor, UV, etc. I even found an inexpensive PVC flow control valve to put in the branch the the skimmer that would set that flow at 900gph. Has anyone ever done something like this? Is this a bad idea? I'd appreciate your thoughts.
Mike
Mike