fatoldsun
NJRC Member
I'm getting ready to setup my sump and plumbing now that the move is behind me. I want to do this ASAP b/c the stock tank isn't a great long term solution. I'd like to change a few things since I have it all broken down anyway. Current setup was all hard PVC plumbing 1" drain split 75% to drain/skimmer and 25% to fuge. Return was a mag9.5. Fuge was Drain/skimmer -->return<--fuge
New plan is a Mag18 to a manifold so I can ditch all the maxijets I had. I annoy sure I need such a large fuge. Trying to decide if I should move to a different sump layout like drain to the fuge then skimmer in the middle with the return last. I'm leaning towards that to illuminate the split drain mess. Also rigid PVC or flex or a combo? I had dripping issues before b/ c the heavy drain lines weren't properly supported
New plan is a Mag18 to a manifold so I can ditch all the maxijets I had. I annoy sure I need such a large fuge. Trying to decide if I should move to a different sump layout like drain to the fuge then skimmer in the middle with the return last. I'm leaning towards that to illuminate the split drain mess. Also rigid PVC or flex or a combo? I had dripping issues before b/ c the heavy drain lines weren't properly supported